Okaloosa County bulkhead permits.
Find who permits your lot.

By Destin BulkheadUpdated

Okaloosa County bulkhead permits come from either the county or a city building office, and the parcel decides which. This guide maps who permits where, which records to pull and the state and federal steps that follow.

About 15 min readOfficial sources linked below

Who issues a bulkhead permit in Okaloosa County?

The answer depends on the parcel, not the mailing address. Okaloosa County Growth Management is the building permit office for all unincorporated land and for the towns of Shalimar, Cinco Bayou and Laurel Hill. Other cities use their own building staff. County permitting guide, Oct. 2026

That split catches many owners. Kelly Plantation and Regatta Bay have Destin addresses, yet county GIS places them outside city limits. County city-limit and zoning layers Ocean City and Wright are census places, not towns, so they are county land too. 2024 Census Gazetteer

Which office permits bulkhead and dock work, by area
Where the parcel sitsBuilding permit officeHow to apply
Unincorporated county, including Okaloosa Island, Kelly Plantation, Regatta Bay, Bluewater Bay, Ocean City and Wright
Okaloosa County Growth Management, 1250 N Eglin Pkwy, Suite 301, Shalimar; (850) 651-7180
Online through the county CSS (EnerGov) portal, required since Nov. 3, 2025
Town of Shalimar
Town permit first at Town Hall, 2 Cherokee Road, (850) 651-5723; then the county
Town permit, then the county CSS portal
Town of Cinco Bayou
Town Approval Letter from Town Hall, 10 Yacht Club Drive, (850) 833-3405; then the county
Town letter, then the county CSS portal
City of Destin
Building Division, City Hall Annex, 4100 Indian Bayou Trail; (850) 654-1119, option 2
MyGovernmentOnline (MGO) portal
Fort Walton Beach
Building & Inspections, City Hall Annex, 105 Miracle Strip Pkwy SW; (850) 833-9605
MGO portal; no paper plans since May 2022
Mary Esther
City building services run by E.P. Consultants (EPCI) since Aug. 24, 2026; City Hall (850) 243-3566
GovWell online portal
Niceville
Community Development, 212 Partin Drive N
In person or by email to building@nicevillefl.gov; online portal listed as coming soon
Valparaiso
Building Department, City Hall, 23 South John Sims Pkwy; (850) 729-5402
Paper application form from City Hall

Offices and contacts from official pages: County Growth Management offices County CSS portal Bluewater Bay MSBU ordinance Shalimar Town Hall Cinco Bayou Town Hall Destin Building Division Destin MGO process Fort Walton Beach Building & Inspections Fort Walton Beach MGO portal Mary Esther building services Mary Esther GovWell Niceville Community Development Niceville submissions Valparaiso Building Department

Look up the parcel before you call. A Destin, Fort Walton Beach or Shalimar mailing address does not tell you who permits the work. Find the parcel on the county map, then start with the office in the table. Each local area guide names its own office.

Okaloosa County area guides: who permits your shore

Each local guide names the permit office, the water and the rule that matters most for that shore.

Which towns and cities add a local approval first?

Several small governments add their own approval before the building permit. Skip it and the application stalls.

  • Shalimar. Get the Town of Shalimar permit before the county will take plans. Only some streets are in town, such as #2 Carl Brandt and the even-numbered addresses on Old Ferry Road. County permit guide for Shalimar County street list Contractors also buy a Town Contractor’s Tracking Certificate, $30 or $15 by half-year, cash or check only. Town contractor certificate
  • Cinco Bayou. The town wants its approval letter before plans go to the county. Cinco Bayou permits page For a new dock, or a rebuild of more than half of one, its code adds planning review and Town Council votes. It may also require an environmental benefit worth up to 25% of the project value. Town code 12.05.01
  • Mary Esther. The city’s marine code calls for City Council approval before and after the state and federal permits. It also asks for a “net positive environmental benefit” in the Sound equal to 25% of project value. Ask City Hall how both rules work today. Mary Esther LDC 11.05.02
  • Destin. No city permit issues until state and federal approvals are in hand, and a copy of the joint application goes in the city file. Destin LDC 11.05 Single-family docks moved to staff review in April 2026. Ordinance 26-13-LC
  • Valparaiso. Owners file their FDEP and Army Corps approvals with the city first. The building official then has 30 days to review before the city permit. Valparaiso Code 83-21

Fort Walton Beach decides dock and boat-structure permits at staff level, with no board hearing. FWB LDC Table 9.01.01 For the general sequence across agencies, see the bulkhead permit guide.

Okaloosa Island: leaseholder review comes before the county permit

Okaloosa Island adds a private review step. Single-family docks and seawalls are “minor projects” under county code. The Okaloosa Island Leaseholders Association Architectural Review Committee and county staff review them before a building permit issues. County LDC 3.01.04

The island’s 1955 covenants go further. They require written County Commission approval for any structure below the high-water line of Santa Rosa Sound, the Gulf or other waters. Where the code and the covenants conflict, the covenants control. Island covenants, Part G.5

  • Many island parcels began as county leases. A 1992 Board policy lets leases convert to title, and the covenants follow either way. Island Authority history
  • The county dock application lists Leaseholders Association approval as a required attachment for island docks. Covenants and dock application
  • Ask Growth Management early whether your scope also needs a Commission vote. That answer sets your schedule.

The Okaloosa Island bulkhead guide covers the sound side, the bay side and the Gulf beach.

How do you check an Okaloosa marine contractor?

Start with the county card. Anyone contracting in unincorporated Okaloosa County needs a current Competency Card from Growth Management. Keeping it takes workers’ comp, liability insurance, a business tax receipt and any required state license. County Competency Card rule

Okaloosa also lists “Marine contractor” as a local specialty license. Its scope covers seawalls, bulkheads, docks, piers, boat lifts, revetments and pile driving. County Code 6-274 and 6-312 Applicants need four years of construction experience, including one year of structural marine work, before the exams. Marine Contractor qualifications

Contractor checks by jurisdiction
Where the work isWhat the contractor needsHow to check
Unincorporated county, Shalimar, Cinco Bayou
County Competency Card plus a state or county license that fits the work
County CSS name search, or Licensing at (850) 651-7180
Shalimar (extra step)
Town Contractor’s Tracking Certificate
Town Hall
Destin
State registration or certification, a county Competency Card and city registration ($80 a year)
Destin Building Division
Mary Esther
Free City Contractor Tracking Certificate, renewed by Sept. 30
GovWell public records search
Anywhere in Florida
A state marine specialty license (created in 2024) or another license that covers the full scope
State DBPR license search

Sources: County license types and lookup Destin Code 13-71 to 13-77 Mary Esther Code 13-26 Rule 61G4-15.100

Match the license to the whole job. A bulkhead replacement can include piles, a concrete cap, tiebacks and backfill. Ask which license covers each part, and ask county licensing staff to confirm the local marine category is still issued. The contractor check guide walks through the steps.

Complaints about a county-certified contractor go to the Construction Competency Board, which holds disciplinary hearings. Competency Board

Where to find parcel, permit and deed records

Pull the records before anyone designs a new wall. They show who owns what, what was permitted and what the flood map says.

Okaloosa records for a waterfront parcel
RecordWhere to find itWhat it answers
Parcel number and map
Property Appraiser and the county WebGIS; parcel GIS questions (850) 651-7240
Who owns the lot and where its lines fall
County permits
County CSS portal; permits issued through April 2025 sit in the older system
What was permitted on the lot before
Destin permits
City MGO portal
Permit history inside Destin
Mary Esther permits
GovWell public records search
City permits since the August 2026 switch
Deeds, easements, Notices of Commencement
Clerk’s Official Records search; recording costs $10 for the first page
Easements, recorded surveys and notices of past work
Flood zone and elevation certificates
County Forerunner flood site
Zone, base flood elevation and certificates on file

Sources: County GIS and parcel help County CSS portal Destin MGO process Mary Esther GovWell Clerk Official Records County flood tools

Two record tips. The Clerk holds recorded documents, not building permits, so search both systems. In Destin, the owner name on the permit must match the Property Appraiser record. Fix a trust or LLC mismatch before you apply.

Flood maps and V zones: what they mean for a seawall

Okaloosa County and Destin both use the flood study dated March 9, 2021. Look up the zone, base flood elevation (BFE) and elevation certificates on the county’s Forerunner site. WebGIS questions go to (850) 651-7523. County flood map tools Destin flood study adoption

The zone matters for the wall itself. In V zones and Coastal A zones, county code allows bulkheads and seawalls only with a design professional’s analysis. It must show the wall will not divert floodwater or reflect waves onto nearby buildings. County LDC 3.06.16.G Destin’s version of the rule covers V zones. Destin LDC 11.04.17.G

  • Okaloosa Island V zone: buildings need their lowest structural member at or above 9.6 feet NAVD88, the national elevation datum. That is a building rule, not a wall height. County LDC 3.06.10.D
  • Destin homes: dwellings in flood zones must sit at base flood elevation plus 2 feet. Destin Sec. 6-47(C)
  • COBRA area near Destin: federally backed flood insurance is not sold there. Check the parcel before you count on a flood policy. County 2025 flood flyer
  • Free site visits: county Public Works offers flood-protection visits at (850) 689-5772. County 2025 flood flyer

We found no county or Destin rule that sets a seawall cap height. The cap elevation comes from the engineer’s design and the state and federal permits. The seawall height guide explains how to compare elevations in the same datum.

What do Okaloosa bulkhead permit fees look like?

Most offices charge marine work by the value of the job. None of the schedules we read has a separate seawall line, so ask each office how it classifies a bulkhead.

Permit fee basis by office (2025-2026 schedules)
OfficeHow the fee is figuredExtras to ask about
Okaloosa County
Value table used for docks and boathouses; for example, $215 for the first $50,000 plus $3 per $1,000 up to $100,000
$70 base fee per permit; residential plan review is the greater of $25 or 20%
Destin
$16.30 per $1,000 of construction cost for docks, bulkheads and seawalls, plus a $33 planning fee
$77 processing fee; $250 residential marine application fee; work started early is charged double
Destin Harbor and its canals
A Net Positive Environmental Benefit of 25% of construction cost for docks, piers and similar work
Ask Planning whether a wall-only repair triggers it
Fort Walton Beach
Value tiers; for example, $623 plus $4 per $1,000 for jobs from $100,001 to $500,000
Plan check is 50% of the building fee; early work costs three times the fee
Mary Esther
$95 minimum up to $10,000, then value tiers under Resolution 26-09
Plan review from $45; double fee if work starts before the permit
Niceville
$75 minimum up to $10,000, then value tiers effective Sept. 1, 2026
Residential plan review adds 25% of the permit fee
FDEP (state)
$100 to verify an exemption, $250 for a general permit, $420 for a small individual permit
State-lands fees are separate

Sources: County fee schedule, 2017 Destin Resolution 25-10 Destin marine application fee Destin LDC 11.05.02.N FWB fee schedule, Nov. 2025 Mary Esther Resolution 26-09 Niceville Resolution 26-08-01 Rule 62-4.050

The county’s October 2026 permitting guide says regular fees apply unless the County Commission approves a storm waiver. County post-storm guide Permit fees are a small share of the job, so plan the rest with the bulkhead budget planner.

What have public shoreline projects in Okaloosa cost?

Public projects are the only local shoreline costs on record. They are large, grant-funded jobs, not residential quotes. They do show what drives cost and time.

Public shoreline and waterfront projects in Okaloosa County
ProjectScopeReported costStatus
Veterans and Ross Marler parks, Okaloosa Island
2,000 feet of living shoreline in Choctawhatchee Bay
About $4.6 million from three funding sources
Ribbon cutting Feb. 12, 2026
Fort Walton Beach Landing, Phase I
Seawall, boardwalk, pocket beach and living shoreline on Santa Rosa Sound
$2,479,665 contract (Feb. 2023)
State permit 2018; Army Corps permit 2022
Norriego Point, Destin
Erosion-control structures and sand fill at East Pass
$9.7 million stabilization estimate (2017)
Stabilized 2019; park opened Nov. 2025
Joe’s Bayou Recreation Area, Destin
Ramp access, pier, trails, saltmarsh and a living shoreline
$12,202,891 in the 2018 draft plan
Upcoming on the city’s Oct. 2026 project board
Destin Army Recreation Area
Repair of a seawall damaged by Hurricane Michael
About $1 million projected (2020)
Federal site; wall mostly underwater, to 17 feet deep
Niceville Landing, Phase I
Public dock and pier on Boggy Bayou
Two bids: $2,853,257 and $3,424,910 (2025)
Awarded August 2025

Sources: County release, Feb. 2026 FWB staff report, Feb. 2023 NOAA project notice, 2017 Florida TIG factsheet, 2026 Draft Restoration Plan 1 Destin project boards Army article, 2020 Niceville CRA packet

The federal permit set the pace. The Fort Walton Beach Landing had its state permit in May 2018 but waited until May 2022 for the Army Corps. The city blamed its over-estimate bid mainly on that wait.

The county calls its island living shoreline more cost-effective than traditional shoreline barriers. Compare both approaches in the living shoreline guide.

The state and federal layer: FDEP and the Army Corps

Nearly every bulkhead job at the water also needs a state and a federal answer. For single-family seawalls, riprap and docks, the Florida Department of Environmental Protection (FDEP) does the state review, not the water management district. DEP-NWFWMD operating agreement

State and federal contacts for Okaloosa waterfront work
AgencyWhat it decidesContact
FDEP Northwest District
Environmental Resource Permits, exemptions and use of state-owned bottom
160 W. Government St., Suite 308, Pensacola; (850) 595-8300
U.S. Army Corps of Engineers, Pensacola Permits Section
Federal authorization for work in the water
41 N Jefferson St, Ste 301, Pensacola; (850) 470-9824
FDEP Coastal Construction Control Line program
Gulf-front work seaward of the CCCL
(850) 245-8570

Sources: DEP Northwest District Corps Pensacola Section DEP CCCL program

  • Repair in place: Florida exempts seawall restoration at the old line, behind it or within 18 inches waterward. Other rules can still apply. s. 403.813(1)(e), F.S.
  • Estuary walls: when FDEP reviews a replacement wall in an estuary or lagoon, it generally requires riprap facing or a full riprap edge, with narrow exceptions. s. 373.414(5), F.S.
  • Rock at the toe: a state general permit covers riprap at the base of an existing wall, up to 10 feet out at a 2:1 slope. Rule 62-330.431
  • Federal permits: the 2026 Nationwide Permit 13 covers bank stabilization up to 500 feet, and NWP 54 covers living shorelines. NWP 13 NWP 54
  • Rocky Bayou: east of the State Road 20 bridge it is the county’s only aquatic preserve, with tighter dock limits. County dock form

A state permit does not replace the federal one. USACE guidance File both early. In 2026 Fort Walton Beach dropped a boat launch from a $3.1 million park contract because the Corps permit had not arrived. FWB staff report, March 2026

Gulf-front lots follow the Coastal Construction Control Line

On the Gulf, a seawall is “coastal armoring” under the Coastal Construction Control Line (CCCL). The CCCL is a state permit line along the beach, not a setback. Okaloosa’s line dates from 1992 and runs from Okaloosa Island east to the Walton County line, broken by Eglin Air Force Base. Rule 62B-26.003

County code requires the FDEP CCCL permit with the site plan for work seaward of the line, and sends those applications to the County Commission. County LDC 6.02.01(10) Florida’s armoring rule took a new effective date on July 7, 2026, so older summaries are out of date. Rule 62B-33.0051

  • FDEP lists 6.5 miles of critically eroded Gulf beach in Okaloosa County. DEP critically eroded beaches, June 2026
  • That total includes 2.8 miles on Okaloosa Island, 1.6 miles in west Destin and 2.1 miles in east Destin.
  • Another 0.8 mile of inlet shoreline at Norriego Point is also listed.

The Gulf-front Destin and Crystal Beach guide walks through the armoring permit.

After Hurricane Isaias: rebuild deadlines to know

Hurricane Isaias made landfall near Destin on Oct. 9, 2026, as a Category 2 storm. The National Weather Service’s preliminary report lists a peak of about 4 feet at the Old Pass Lagoon gauge. That is measured above mean higher high water, the average daily high tide. NWS preliminary Isaias report

Several local codes give a rebuild window that starts on the day of the damage. Miss it, and today’s size limits apply to the rebuild.

Storm repair rules and deadlines in Okaloosa County
WhereRuleDeadline
Destin
Damaged docks and similar facilities may be rebuilt at the same or smaller size, even if they exceed today’s length and slip limits
Permit application within 6 months of the damage
Destin
No permit needed for board-for-board repair of originally permitted docks and fences; seawalls are not mentioned
60 days from Oct. 13, 2026
Mary Esther
Same or smaller rebuild of damaged docks and marine facilities
Within 6 months of the damage
Cinco Bayou
Same or smaller rebuild, with the town permit application
Within 6 months of the damage
Valparaiso
Same or smaller rebuild of damaged waterfront facilities
Within 6 months of the damage
Fort Walton Beach
Emergency repair without the late-permit penalty
Apply on the first working day after
Unincorporated county
Dock and seawall repair generally needs a permit; state or federal approval may also apply
Regular fees unless the Commission waives them

Sources: Destin LDC 11.05.10 Destin exemption notice Mary Esther LDC 11.05.10 Cinco Bayou LDC 12.05.09 Valparaiso Code 83-28 FWB Code 3.01.05 County post-storm guide

Photograph first, then file. Dated photos of the wall and dock support both the permit and any insurance claim. The storm damage guide lists what to record.

Show sourcesHide sources
  1. Okaloosa County Storm Post-storm Permitting Guide/PlanSource reviewed 2026-10-27
  2. Okaloosa County GIS: city limits and county zoningSource reviewed 2026-10-27
  3. 2024 Census Gazetteer Files: Places, FloridaSource reviewed 2026-10-27
  4. Growth ManagementSource reviewed 2026-10-27
  5. PermittingSource reviewed 2026-10-27
  6. Bluewater Bay Municipal Services Benefit Unit request for proposals (July 14, 2020) with attached Ordinance 02-16Source reviewed 2026-10-27
  7. Town Hall | Shalimar, FLSource reviewed 2026-10-27
  8. Town Staff - Cinco BayouSource reviewed 2026-10-27
  9. Building DivisionSource reviewed 2026-10-27
  10. How Do I Submit A Permit Application? (Building Division brochure)Source reviewed 2026-10-27
  11. Building & Inspections | Fort Walton Beach, FLSource reviewed 2026-10-27
  12. My Government Online (MGO) | Fort Walton Beach, FLSource reviewed 2026-10-27
  13. Building Services Update (News Flash, posted July 29, 2026)Source reviewed 2026-10-27
  14. Permits & Inspections | Mary Esther, FLSource reviewed 2026-10-27
  15. Community Development | Niceville, FLSource reviewed 2026-10-27
  16. Residential Building Permit Exemption (HB 803) | Niceville, FLSource reviewed 2026-10-27
  17. Building | Valparaiso FLSource reviewed 2026-10-27
  18. Permit Guide for Town of Shalimar (Department of Growth Management, May 2025)Source reviewed 2026-10-27
  19. Frequently Asked Questions: Do you need a license to do work in Shalimar?Source reviewed 2026-10-27
  20. Permits - Cinco BayouSource reviewed 2026-10-27
  21. Code of Ordinances, Town of Cinco Bayou (Municode, Supp. No. 8, codified through Ord. No. 248, enacted September 9, 2021), Land Development Code Sec. 12.05.01Source reviewed 2026-10-27
  22. Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Sec. 11.05.02Source reviewed 2026-10-27
  23. Destin LDC Sec. 11.05.00 Marina sitingSource reviewed 2026-10-27
  24. Destin Land Development Code - Adopted Ordinances Not Yet CodifiedSource reviewed 2026-10-27
  25. Valparaiso Code of Ordinances Ch. 83 Waterways, Sec. 83-21 Permitting proceduresSource reviewed 2026-10-27
  26. Land Development Code, City of Fort Walton Beach (Municode, Supp. No. 17, codified through Ord. No. 2194, enacted January 27, 2026), Sec. 9.01.01 (Table 9.01.01) and Sec. 9.02.04Source reviewed 2026-10-27
  27. Okaloosa County LDC Chapter 3, 3.01.00 Subdivision of Okaloosa IslandSource reviewed 2026-10-27
  28. Protective Covenants and Restrictions, Okaloosa Island (OR Book 121, Pages 233-250, as updated)Source reviewed 2026-10-27
  29. Protective Covenants and Restrictions for Okaloosa Island; Okaloosa County Residential Dock Application/Requirements (Permit Form 12-0710, 01/02/2020)Source reviewed 2026-10-27
  30. Choosing a ContractorSource reviewed 2026-10-27
  31. Okaloosa County Code of Ordinances Ch. 6, Art. VIII, Secs. 6-274 and 6-312Source reviewed 2026-10-27
  32. Ordinance 07-32, Amended Okaloosa County Construction Industry Code, Sec. 3-3Source reviewed 2026-10-27
  33. LicensingSource reviewed 2026-10-27
  34. Destin Code of Ordinances Ch. 13, Art. IV Local Licensing of ContractorsSource reviewed 2026-10-27
  35. Business Licenses | Mary Esther, FLSource reviewed 2026-10-27
  36. Rule 61G4-15.100, F.A.C., Certified Specialty ContractorsSource reviewed 2026-10-27
  37. Okaloosa County Construction Competency BoardSource reviewed 2026-10-27
  38. Geographic Information Systems (GIS)Source reviewed 2026-10-27
  39. Search Records; Record ServicesSource reviewed 2026-10-27
  40. CRS Flood Facts & Elevation CertificatesSource reviewed 2026-10-27
  41. Flood Map & Other Mapping Information; Destin LDC 11.04.02.CSource reviewed 2026-10-27
  42. Destin LDC Sec. 11.04.17 Flood resistant development - Other developmentSource reviewed 2026-10-27
  43. Destin Code of Ordinances Sec. 6-47 Administrative amendments to the Florida Building CodeSource reviewed 2026-10-27
  44. 2025 Flood Protection Information (CRS Flood Facts flyer)Source reviewed 2026-10-27
  45. Inspection & Permitting FeesSource reviewed 2026-10-27
  46. Resolution 25-10, Schedule of Fees, Section 2: Building Permits and Developer FeesSource reviewed 2026-10-27
  47. City of Fort Walton Beach Comprehensive Fee Schedule, November 18, 2025 (page 10, Building Permit Fees)Source reviewed 2026-10-27
  48. Agenda Packet, Special City Council Meeting, City of Mary Esther, May 18, 2026, Item 8.2 Resolution 26-09 (Exhibit A fee schedule)Source reviewed 2026-10-27
  49. City of Niceville - Community Development Fee ScheduleSource reviewed 2026-10-27
  50. 62-4.050 Procedure to Obtain Permits and Other Authorizations; ApplicationsSource reviewed 2026-10-27
  51. Okaloosa County Completes 2,000 feet of Living Shoreline on the Choctawhatchee Bay (press release)Source reviewed 2026-10-27
  52. City of Fort Walton Beach City Council Regular Meeting, February 14, 2023, Item: Award of ITB 23-002 - Fort Walton Beach Landing Improvements - Phase I (agenda and minutes)Source reviewed 2026-10-27
  53. Norriego Point Project Kicks OffSource reviewed 2026-10-27
  54. Deepwater Horizon NRDA and Restoration, Florida Restoration Area factsheet (June 2026)Source reviewed 2026-10-27
  55. Deepwater Horizon NRDA Florida Restoration Area - Provide and Enhance Recreational Opportunities, Draft Restoration Plan 1/EA fact sheetSource reviewed 2026-10-27
  56. City of Destin Project Boards (rev. 2026-10-21); Beacon Bid open solicitationsSource reviewed 2026-10-27
  57. Workers to repair storm-battered seawall at Destin Army Recreation Area in FloridaSource reviewed 2026-10-27
  58. Niceville CRA Board Meeting Agenda, August 12, 2025 (with Procurement Services memo dated August 5, 2025)Source reviewed 2026-10-27
  59. Operating Agreement Concerning Regulation Under Part IV, Chapter 373, F.S., Between NWFWMD and DEPSource reviewed 2026-10-27
  60. Northwest DistrictSource reviewed 2026-10-27
  61. Jacksonville District Regulatory Office LocationsSource reviewed 2026-10-27
  62. Coastal Construction Control Line Program (with linked CCCL Permit Managers and CCCL Field Inspector pages)Source reviewed 2026-10-27
  63. 2026 Florida Statutes section 403.813Source reviewed 2026-10-27
  64. 2026 Florida Statutes s. 373.414Source reviewed 2026-10-27
  65. 62-330.431 General Permit for Installation of RiprapSource reviewed 2026-10-27
  66. Reissuance and Modification of Nationwide Permits (full text), NWP 13Source reviewed 2026-10-27
  67. Residential Dock Application/Requirements (Permit Form 12-0710)Source reviewed 2026-10-27
  68. USACE South Atlantic Division Florida regulatory guidanceSource reviewed 2026-10-27
  69. City of Fort Walton Beach City Council Regular Meeting, March 24, 2026, Item: Award of ITB 25-010 Liza Jackson Park Improvements (agenda and minutes)Source reviewed 2026-10-27
  70. 62B-26.003 Description of the Okaloosa County Coastal Construction Control LineSource reviewed 2026-10-27
  71. Okaloosa County LDC Chapter 6, 6.02.01(10) Coastal Construction CodeSource reviewed 2026-10-27
  72. Florida rule 62B-33.0051, amended July 7 2026Source reviewed 2026-10-27
  73. Critically Eroded Beaches in Florida (June 2026)Source reviewed 2026-10-27
  74. Post Tropical Cyclone Report: Isaias (NWS Mobile/Pensacola), last updated 10/13/2026, initial issuanceSource reviewed 2026-10-27
  75. Building Permit Exemption for fence and dock repairs (News Flash)Source reviewed 2026-11-05
  76. Code of Ordinances, Town of Cinco Bayou (Municode, Supp. No. 8, codified through Ord. No. 248, enacted September 9, 2021), Land Development Code Secs. 12.05.06 and 12.05.09Source reviewed 2026-10-27
  77. Valparaiso Code Sec. 83-28 Reconstruction of existing facilitiesSource reviewed 2026-10-27
  78. Code of Ordinances, City of Fort Walton Beach (Municode, Supp. No. 18, codified through Ord. No. 2204, enacted February 24, 2026), Secs. 3.01.03 and 3.01.05Source reviewed 2026-10-27

Get help with your bulkhead.

Tell us where your property is and what your bulkhead or seawall needs.

Every answer here links to the public record behind it.