Mary Esther · Your waterfront project

Mary Esther bulkhead repair and Santa Rosa Sound permits

Bulkhead repair in Mary Esther now runs through the city's own GovWell portal, not Okaloosa County. Dock and seawall work on Santa Rosa Sound also carries City Council steps and a six-month storm rebuild window.

Describe your project on this page ↓
Mary Esther waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Mary EstherFort Walton BeachSantaRosaSoundMary Esther waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Mary EstherFort Walton BeachSantaRosaSound
Land and water: U.S. Census Bureau TIGERweb, 2026. Reference points: USGS GNIS, NOAA CO-OPS and Okaloosa County GIS. General orientation only; not a survey, flood map or service boundary.

Mary Esther at a glance

Who permits it
City of Mary Esther, through its GovWell portal, not Okaloosa County
Call first
City of Mary Esther, (850) 243-3566
The water
Santa Rosa Sound. The normal tide runs close to a foot.
Local rule to know
City Council approves seawall and dock permits twice, before and after the state and federal permits.

Get to know your waterfront

Mary Esther's marine code is written for one body of water, Santa Rosa Sound. The normal tide here runs close to a foot, well above the half foot measured at Fort Walton Beach next door. City Council approves seawall and dock permits twice: once before anything else, and again after the state and federal permits. Since August 24, 2026, building permits go through the city's GovWell system, with plan review and inspections by a private firm.

Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Sec. 11.05.01 · NOAA CO-OPS datums, station 8729572 Mary Esther · NOAA CO-OPS datums, station 8729554 Fort Walton Beach, Santa Rosa Sound · Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Sec. 11.05.02 · Building Services Update (News Flash, posted July 29, 2026)

What to check on a Mary Esther seawall after Isaias

Write down the date your bulkhead (seawall) or dock was damaged. City code lets you rebuild a storm-damaged dock or marine facility at the same or smaller size, free of today's length and slip limits. The catch is timing: the permit application must be filed within six months of the damage Mary Esther LDC 11.05.10.

Isaias brought extreme rain here. The National Weather Service's preliminary report lists nearly 12 inches at a gauge just east of Mary Esther, the highest total in its area NWS preliminary Isaias report. Water-soaked fill pushes harder on a wall and can wash out through open joints. Our page on soil loss behind a bulkhead shows what to look for.

Walk the wall at low water

  • The toe. With close to a foot of normal tide, low water is the best time to see the toe, where the wall enters the sand. Look for gaps, scour holes and lean.
  • The cap and panels. Note cracks, rust stains and open joints in the cap (the concrete top beam) and the panels below it. See cap and panel repair.
  • Turtlegrass beds. Turtlegrass is the main seagrass in Santa Rosa Sound, and about one-fourth of the sound's beds show prop scars FWC seagrass report. Seagrass near the wall can limit riprap (loose rock at the toe) and dock choices.
  • Dock size and lights. A pier may reach 20 percent of the sound's width or 200 feet, whichever is less. Lots under 50 feet of waterfront get no individual dock, and docks 100 feet or longer need a dusk-to-dawn light Mary Esther LDC 11.05.01.
  • Registration. Owners must register existing docks, seawalls and bulkheads with the city, and tell the city when one is destroyed to half its replacement value Mary Esther LDC 11.05.08.

Photograph everything before debris pickup. The city asked residents to pile dock and construction debris apart from yard waste City of Mary Esther storm update. Our storm damage guide and insurance guide cover the claim side.

Ask City Hall early about the Net Positive Environmental Benefit. The code ties it to 25 percent of project valuation, delivered within Santa Rosa Sound Mary Esther LDC 11.05.02. Ask how it is valued and met before you set a budget.

What could the work cost?

The biggest unknown may be the environmental benefit tied to 25 percent of project value, so get the city's answer in writing before you sign. Mary Esther's own permit fees are based on valuation and were set below Fort Walton Beach's at every tier. Starting work before a permit doubles the fee.

These per-foot figures are 2019 City of Destin bids for a 325-foot public park seawall. They are not a residential quote or a 2026 market average; your written, itemized scope sets the real price.

Compare quotes and plan a budget →

Find the relevant permits and records

Mary Esther researched starting points
Starting pointWhat to resolvePrepare and look up
City of Mary Esther (GovWell)
Building permit for seawalls, docks and boathouses. Seawall and boathouse plans go to the building official, E.P. Consultants.
Apply at app.govwell.com/mary-esther. Staff help at City Hall, 195 Christobal Road N, or by phone at (850) 243-3566.
Mary Esther City Council
Preliminary approval before any other step, and final approval after state and federal permits. Marine permits last six months.
City form, the joint USACE/state application, a survey with riparian lines and lot width, and a scaled drawing.
FDEP Northwest District
State permit or exemption and state-lands consent for any work waterward of the line in the sound.
DEP, not the water management district, reviews shore protection and docks here; its Pensacola office is (850) 595-8300.
U.S. Army Corps of Engineers, Pensacola Section
Federal sign-off for work in the sound, which is designated Gulf sturgeon critical habitat.
Send the same joint application the Council sees; Corps questions go to (850) 470-9824.

Prepare the questions for the responsible office.

Your Mary Esther storm-repair checklist

Use these four steps for any dock or seawall repair after the October storm. Keep a written log of dates, photos and calls.

  1. Record the damage before cleanup

    Take photos and video before debris goes to the curb, and keep damaged samples where it is safe. Pile dock debris apart from yard waste, as the city asked.

    Document flood damage · Hurricane Isaias Recovery Update: Debris Pickup Continues, Permits for Storm Repairs (posted October 19, 2026)

  2. Check the contractor's city certificate

    Any contractor pulling a Mary Esther permit needs a free City Contractor Tracking Certificate, renewed by September 30. Look it up on the city's GovWell public records page.

    Business Licenses | Mary Esther, FL

  3. Let the contractor pull the permit

    The city advises letting the contractor pull the permit and never paying in full up front. It also notes that registration confirms license and insurance only, not the quality of the work.

    Hiring a Contractor for Storm Repairs? Verify They're Registered With the City

  4. Watch two six-month clocks

    Apply within six months of the damage to keep a rebuild's old dimensions. Once issued, a marine permit is valid for six months, so schedule the work before it lapses.

    Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Secs. 11.05.08 and 11.05.10 · Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Sec. 11.05.02

Start with what you know

Plan your Mary Esther seawall or dock repair

Tell us what the storm did to your wall or dock and when you first noticed it. Get help with your bulkhead plan before either six-month clock runs out, including a referral to a qualified marine contractor.

Every answer here links to the public record behind it.

Prefer to talk it through?(850) 904-4847

Getting your form ready…

Mary Esther project questions

Does Okaloosa County still issue Mary Esther building permits?

No, not for new applications. Since August 24, 2026, all Mary Esther building permit applications go through the city's GovWell system, with plan review and inspections by E.P. Consultants. Permits issued before that date are being finished with the county under the old process. Older county permit guides for Mary Esther are out of date.

Building Services Update (News Flash, posted July 29, 2026)

Can I replace dock boards after the storm without a permit?

City code allows routine board-for-board or plank-for-plank repair that does not enlarge the dock. But the city's October 19 storm update says most repairs, including docks, need a permit. Piles, stringers and seawall panels are structural work. Call City Hall at (850) 243-3566 before you start.

Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Secs. 7.12.02 and 11.05.07 · Hurricane Isaias Recovery Update: Debris Pickup Continues, Permits for Storm Repairs (posted October 19, 2026)

What is Mary Esther's six-month rule for damaged docks?

If a storm, accident or wear damages an existing dock or marine facility, you may rebuild it to the same or smaller size. That holds even if it breaks today's length, piling, lot-width or slip limits. The application has to reach the city no later than six months after the damage. Confirm the start date with the city.

Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Secs. 11.05.08 and 11.05.10

How is the Mary Esther permit fee figured?

By total valuation, under Resolution 26-09. A residential job of $10,000 or less pays the $95 minimum. From $10,001 to $75,000, it is $95 plus $5.25 per $1,000 over $10,000, plus plan review. State surcharges are added, and work started before a permit pays double.

Agenda Packet, Special City Council Meeting, City of Mary Esther, May 18, 2026, Item 8.2 Resolution 26-09 (Exhibit A fee schedule)

Keep planning

Nearby waterfront guides

Fort Walton Beach, Okaloosa Island

View the local guide directory.

Show sourcesHide sources
  1. Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Sec. 11.05.01Source reviewed 2026-10-27
  2. NOAA CO-OPS datums, station 8729572 Mary EstherSource reviewed 2026-10-27
  3. NOAA CO-OPS datums, station 8729554 Fort Walton Beach, Santa Rosa SoundSource reviewed 2026-10-27
  4. Building Services Update (News Flash, posted July 29, 2026)Source reviewed 2026-10-27
  5. Post Tropical Cyclone Report: Isaias (NWS Mobile/Pensacola), last updated 10/13/2026, initial issuanceSource reviewed 2026-10-27
  6. Summary Report for Pensacola Bay Region (incl. Santa Rosa Sound), SIMM Report No. 3Source reviewed 2026-10-27
  7. Hurricane Isaias Recovery Update: Debris Pickup Continues, Permits for Storm Repairs (posted October 19, 2026)Source reviewed 2026-10-27
  8. Permits & Inspections | Mary Esther, FLSource reviewed 2026-10-27
  9. Northwest DistrictSource reviewed 2026-10-27
  10. Operating Agreement Concerning Regulation Under Part IV, Chapter 373, F.S., Between NWFWMD and DEPSource reviewed 2026-10-27
  11. Jacksonville District Regulatory Office LocationsSource reviewed 2026-10-27
  12. 50 CFR 226.214 Critical habitat for Gulf sturgeonSource reviewed 2026-10-27
  13. Document flood damageSource reviewed 2026-10-23
  14. Business Licenses | Mary Esther, FLSource reviewed 2026-10-27
  15. Hiring a Contractor for Storm Repairs? Verify They're Registered With the CitySource reviewed 2026-10-27
  16. Land Development Code, City of Mary Esther (Municode, Supp. No. 11, codified through Ord. No. 2025-06, adopted October 6, 2025), Secs. 7.12.02 and 11.05.07Source reviewed 2026-10-27
  17. Agenda Packet, Special City Council Meeting, City of Mary Esther, May 18, 2026, Item 8.2 Resolution 26-09 (Exhibit A fee schedule)Source reviewed 2026-10-27